MEP Design Director – Data Center Construction

Remote, USA Full-time Posted 2026-05-04
Apply Now
    Job Description:
  • Provides support and reports to the assigned Project Manager(s) or Project Director
  • Responsible for ensuring all aspects of client services are delivered at the highest level
  • Aids in the preparation of documents for programming, design, and construction
  • Manage external design consultants through the design and construction process
  • Identify and implement innovative technologies to enhance energy efficiency, system resilience, and cost-effectiveness
    Requirements:
  • College Degree in Engineering (Mechanical, Electrical), Architecture, Construction Management, or related field
  • Experience in Project Management on large-scale construction programs, including data centre or mission-critical facilities
  • Experienced in MEP design
  • Solid working proficiency with AutoCAD, Revit, Bluebeam, and MS Office Suite
  • Strong understanding of concurrently maintainable electrical power systems, mechanical cooling systems, and OFCI equipment specifications
  • Excellent presentation skills
    Benefits:
  • Health insurance
  • Retirement plans
  • Paid time off
  • Flexible working arrangements
  • Professional development

Apply tot his job

Apply To this Job

Similar Jobs